Starting go together now, the bar area is boarded both sides, the power cables and metal socket boxes in, Fridge in place, and top timber ledge ready to be fitted. Adam sanded down all the skirting boards, and Gary, well he was around somewhere, I think he maybe a bit shorter than we imagined, will have to lower one end of the counter edge for him.
Bar area is boarded both sides
The floor is starting to go down now, with polystyrene insulation underneath, here we see Gary at work just getting up from a quick lie down.
All the joints are glued, giving a firm but warm feel.
Here above, we see the end wall stud creeping higher
Under this flooring in the loft space is 4 inches of insulation,