The stud was insulated
Most of the flooring is down, even inside the workshop, and the kitchen was delivered today. The wall behind the stud was insulated and the plaster boarding started, and the expanse of the flooring, right up to the tea bar.
Most of the flooring is down, even inside the workshop, and the kitchen was delivered today. The wall behind the stud was insulated and the plaster boarding started, and the expanse of the flooring, right up to the tea bar.
Starting go together now, the bar area is boarded both sides, the power cables and metal socket boxes in, Fridge in place, and top timber ledge ready to be fitted. Adam sanded down all the skirting boards, and Gary, well he was around somewhere, I think he maybe a bit shorter than we imagined, will have …
Work goes on, today we saw more plasterboard going up on the ceiling and all round the workshop, just cutting in to do. The electric cupboard, now formed, and a door liner made, should be ready for boarding. The first light cables for the workshop, table 1 and 2 are in place, ready to drop …
Today all work seemed to accelerate, flooring arrived, polystyrene underfloor insulation, plasterboard and the rest of the timber. We can see the new stud for the Kitchenette, being erected this will encompass the “Tea” facilities. As you can see this will probably become the first task completed. Below, you can see the underfloor insulation stack, …
You can finally see the shape of things to come, back tomorrow from 0830 till 1600 hours.
All is clear except for materials, Mark helped take down all the heavy industrial trunking, that made it look much more spacious. Paul has put in the toilet and has started on the central heating pipes, Rob generously donated Bacon Sandwiches, and swept down all the walls, and floor de-nailing as he went etc. Marked …
This afternoon the Matchbox was moved then the car inserted, this is the last of the clearing big jobs completed. I started to remove the excess power conduits, electric points, lights and fixtures, fixings. All the area is clear ready for the construction part to begin on Monday. Open from 0900-1400 hrs Saturday for viewing …
To day the majority of the area is now clear, few books and a cabinet and shelving units, and just the Matchbox car to go. Today we had the arrival of all the first stage materials, this has been accomplished, timber, fixings, insulation and liner etc. The plumbing side has been organised, with toilet and …
Friday 16th January 2015. After the opening we have now built the last of the tables a 18 x 6 ft. The carpet tiles are nearly all laid, the last of the emulsion painting is completed and the last of gloss is to be finished on Monday. A Big Thankyou, to all the people who …
Today the work started on clearing the site for the new SSWG Club Venue. Freddie on the forklift and myself shifting, lifting and stacking by hand. Filthy work, but we are progressing, slowly advancing towards the back wall. The high point today was the toilets, they were to be liberated, finally breaking through the final …